Pumpspeicherkraftwerk Atdorf (Q15125609)

  • matcher place: Landkreis Waldshut (relation 62716)
  • view on Wikidata
  • Wikipedia: German
  • Overpass query: show queryOverpass Turbo
    [timeout:300][out:json];
    (
        node(around:1000,47.65140,7.95496)["plant:source"="hydro"][~"^(addr:housenumber|.*name.*)$"~".",i];
        way(around:1000,47.65140,7.95496)["plant:source"="hydro"][~"^(addr:housenumber|.*name.*)$"~".",i];
        rel(around:1000,47.65140,7.95496)["plant:source"="hydro"][~"^(addr:housenumber|.*name.*)$"~".",i];
        node(around:1000,47.65140,7.95496)[power=plant][~"^(addr:housenumber|.*name.*)$"~".",i];
        way(around:1000,47.65140,7.95496)[power=plant][~"^(addr:housenumber|.*name.*)$"~".",i];
        rel(around:1000,47.65140,7.95496)[power=plant][~"^(addr:housenumber|.*name.*)$"~".",i];
    );
    out center tags;
Summary from Deutsch / German Wikipedia (dewiki)

Das geplante Pumpspeicherkraftwerk Atdorf im Hotzenwald war ein Projekt der Laufenburger Schluchseewerk AG. Die Pläne wurden Ende September 2008 veröffentlicht. Es sollte dazu dienen, zeitliche Schwankungen in der Stromerzeugung und im Stromverbrauch durch Speicherung in Form potentieller Energie auszugleichen. Es wäre bei planmäßiger Fertigstellung im Jahr 2019 oder 2021 mit bis zu 1,4 GW maximaler Leistung das größte in Europa geworden. Die beiden neu zu bauenden Becken mit einem Höhenunterschied von 600 m sollten 9 Millionen Kubikmeter Inhalt haben, was einem Arbeitsvermögen von ca. 13 GWh entspricht. Das Kraftwerk sollte in einer Kaverne senkrecht unterhalb des Oberbeckens untergebracht werden.

Wikidata location: 47.6514, 7.9550 view on OSM or edit on OSM

matches

login to upload wikidata tags

no matches found

Search criteria from Wikidata

view with query.wikidata.org

hydroelectric power station (Q15911738) plant:source=hydro
power station (Q159719) power=plant