Veligonda Project (Q19899139)

Summary from English Wikipedia (enwiki)


The Veligonda Project is an irrigation project located in Markapur, Prakasam district in Andhra Pradesh, India. When completed, the project will provide irrigational facilities to 447,000 acres and drinking water to 1.5 million people in 30 Mandals of fluoride and drought affected areas in Prakasam district, Nellore district and Kadapa district by diverting 43.5 TMC of floodwater from the Krishna River from foreshore of Srisailam Reservoir near Kollamvagu and proposed to store in Nallamalasagar Reservoir. The water for the project is drawn through two 18.8 km long tunnels across Nallamala hills. The project has been renamed to the "Poola Subbaiah Irrigation Project". It displaces around 20,946 families. The oustees have protested for enhanced compensation over the years and many have not received the compensation promised to them.

Summary from తెలుగు / Telugu Wikipedia (tewiki)

పూల సుబ్బయ్య వెలిగొండ ప్రాజెక్టు భారతదేశంలోని ఆంధ్రప్రదేశ్ రాష్ట్రానికి చెందిన ప్రకాశం జిల్లాలో నిర్మాణ దశలో ఉన్న భారీ నీటిపారుదల ప్రాజెక్టు. నీటిని శ్రీశైలం జలాశయం ముందలి భాగంలో గల కొల్లం వాగు నుండి రెండు సొరంగ మార్గాల ద్వారా, ఆ తరువాత వరద కాలువ ద్వారా పంపి, నల్లమల కొండలశ్రేణిలో సుంకేశుల, గొట్టిపడియ, కాకర్ల వద్ద ఖాళీలలో కట్టిన ఆనకట్ట ద్వారా ఏర్పడిన జలాశయంలో నింపుతారు. ఈ జలాశయం 43.50 టిఎమ్సి (TMC) నీటిని నిల్వచేయగలదు.

Wikidata location: 15.7683, 79.1806 view on OSM or edit on OSM

matches

login to upload wikidata tags

no matches found