Dazhushan Tunnel (Q56272490)

Summary from 汉语 / Chinese Wikipedia (zhwiki)

大柱山隧道是位于中国云南省保山市境内的一条铁路隧道,全长14.5公里。它是大瑞铁路大保段全线的最高风险隧道,施工难度极大。

Summary from English Wikipedia (enwiki)

The Dazhushan Tunnel (大柱山隧道) is a 14.484 km (9.0 mi) railway tunnel in Baoshan, Yunnan, China as part of the Dali–Ruili railway. Construction of the tunnel began in August 2008 and was carried out by the First Engineering Bure Crec (中铁一局). Its construction was expected to take five years, but because of extreme geological conditions along its alignment, completion took place on 28 April 2020, after 12 years of construction. As another tunnel, Gaoligongshan Tunnel, along the railway line was still under construction, it did not enter service until 2022.

Wikidata location: 25.2628, 99.2522 view on OSM or edit on OSM

matches

login to upload wikidata tags

found a single match candidate

way: 大柱山隧道 (OSM), 4.05 km from Wikidata [show tags]
name: 大瑞铁路
gauge: 1435
layer: -1
usage: main
radius: 1600
tunnel: yes
railway: rail
voltage: 25000
maxspeed: 140
frequency: 50
electrified: contact_line
tunnel:name: 大柱山隧道
opening_date: 2022-07-22
wikidata: Q56272490

wikidata match: Q56272490

Search criteria from Wikidata

view with query.wikidata.org

subterranea (Q863404) location=underground

Search criteria from categories

Railway tunnels in China type=tunnel, tunnel