[timeout:300][out:json]; ( node(around:1000,31.35358,121.58610)[building][~"^(addr:housenumber|.*name.*)$"~".",i]; way(around:1000,31.35358,121.58610)[building][~"^(addr:housenumber|.*name.*)$"~".",i]; rel(around:1000,31.35358,121.58610)[building][~"^(addr:housenumber|.*name.*)$"~".",i]; node(around:1000,31.35358,121.58610)[subway][~"^(addr:housenumber|.*name.*)$"~".",i]; way(around:1000,31.35358,121.58610)[subway][~"^(addr:housenumber|.*name.*)$"~".",i]; rel(around:1000,31.35358,121.58610)[subway][~"^(addr:housenumber|.*name.*)$"~".",i]; node(around:1000,31.35358,121.58610)[landuse=railway][name]; way(around:1000,31.35358,121.58610)[landuse=railway][name]; rel(around:1000,31.35358,121.58610)[landuse=railway][name]; node(around:1000,31.35358,121.58610)["public_transport"="platform"][~"^(addr:housenumber|.*name.*)$"~".",i]; way(around:1000,31.35358,121.58610)["public_transport"="platform"][~"^(addr:housenumber|.*name.*)$"~".",i]; rel(around:1000,31.35358,121.58610)["public_transport"="platform"][~"^(addr:housenumber|.*name.*)$"~".",i]; node(around:1000,31.35358,121.58610)["public_transport"="station"][~"^(addr:housenumber|.*name.*)$"~".",i]; way(around:1000,31.35358,121.58610)["public_transport"="station"][~"^(addr:housenumber|.*name.*)$"~".",i]; rel(around:1000,31.35358,121.58610)["public_transport"="station"][~"^(addr:housenumber|.*name.*)$"~".",i]; node(around:1000,31.35358,121.58610)["public_transport"="stop_area"][~"^(addr:housenumber|.*name.*)$"~".",i]; way(around:1000,31.35358,121.58610)["public_transport"="stop_area"][~"^(addr:housenumber|.*name.*)$"~".",i]; rel(around:1000,31.35358,121.58610)["public_transport"="stop_area"][~"^(addr:housenumber|.*name.*)$"~".",i]; node(around:1000,31.35358,121.58610)["public_transport"="stop_position"][~"^(addr:housenumber|.*name.*)$"~".",i]; way(around:1000,31.35358,121.58610)["public_transport"="stop_position"][~"^(addr:housenumber|.*name.*)$"~".",i]; rel(around:1000,31.35358,121.58610)["public_transport"="stop_position"][~"^(addr:housenumber|.*name.*)$"~".",i]; node(around:1000,31.35358,121.58610)[railway=facility][name]; way(around:1000,31.35358,121.58610)[railway=facility][name]; rel(around:1000,31.35358,121.58610)[railway=facility][name]; node(around:1000,31.35358,121.58610)[railway=halt][name]; way(around:1000,31.35358,121.58610)[railway=halt][name]; rel(around:1000,31.35358,121.58610)[railway=halt][name]; node(around:1000,31.35358,121.58610)["railway"="historic_station"][name]; way(around:1000,31.35358,121.58610)["railway"="historic_station"][name]; rel(around:1000,31.35358,121.58610)["railway"="historic_station"][name]; node(around:1000,31.35358,121.58610)[railway=station][name]; way(around:1000,31.35358,121.58610)[railway=station][name]; rel(around:1000,31.35358,121.58610)[railway=station][name]; node(around:1000,31.35358,121.58610)["railway"="tram_stop"][name]; way(around:1000,31.35358,121.58610)["railway"="tram_stop"][name]; rel(around:1000,31.35358,121.58610)["railway"="tram_stop"][name]; rel(around:1000,31.35358,121.58610)[site=railway][~"^(addr:housenumber|.*name.*)$"~".",i]; rel(around:1000,31.35358,121.58610)["site"="railway_station"][~"^(addr:housenumber|.*name.*)$"~".",i]; rel(around:1000,31.35358,121.58610)[site=station][~"^(addr:housenumber|.*name.*)$"~".",i]; node(around:1000,31.35358,121.58610)[station=subway][~"^(addr:housenumber|.*name.*)$"~".",i]; way(around:1000,31.35358,121.58610)[station=subway][~"^(addr:housenumber|.*name.*)$"~".",i]; rel(around:1000,31.35358,121.58610)[station=subway][~"^(addr:housenumber|.*name.*)$"~".",i]; rel(around:1000,31.35358,121.58610)[type=site][~"^(addr:housenumber|.*name.*)$"~".",i]; ); out center tags;
基隆路站位于上海浦东新区高桥镇富特北路基隆路,为上海轨道交通十号线的一个高架车站和終點站,於2020年12月26日正式啟用。
Jilong Road (Chinese: 基隆路; pinyin: Jīlóng Lù) is a Shanghai Metro station located on Line 10 in Pudong, Shanghai, China. Located at North Fute Road and Jilong Road, within the Shanghai Waigaoqiao Free Trade Zone section of the Shanghai Free-Trade Zone, it serves as a terminus of Line 10, and opened as part of the second phase extension of the line into Pudong. The extension was expected to open in 2018, but due to construction delays, the station, along with the rest of the extension, entered passenger operations on 26 December 2020. The station is the first Shanghai Metro station to be located within a free-trade zone in the country.
no matches found
station (Q12819564) | public_transport=station |
building (Q41176) | building=yes, building |
public transport stop (Q548662) | public_transport=platform, public_transport=stop_position |
railway station (Q55488) | railway=station |
railway facility (Q800279) | landuse=railway |
metro station (Q928830) | station=subway, subway |