[timeout:300][out:json]; ( node(around:1000,32.07649,131.17721)[barrier][~"^(addr:housenumber|.*name.*)$"~".",i]; way(around:1000,32.07649,131.17721)[barrier][~"^(addr:housenumber|.*name.*)$"~".",i]; rel(around:1000,32.07649,131.17721)[barrier][~"^(addr:housenumber|.*name.*)$"~".",i]; node(around:1000,32.07649,131.17721)["drinking_water"][~"^(addr:housenumber|.*name.*)$"~".",i]; way(around:1000,32.07649,131.17721)["drinking_water"][~"^(addr:housenumber|.*name.*)$"~".",i]; rel(around:1000,32.07649,131.17721)["drinking_water"][~"^(addr:housenumber|.*name.*)$"~".",i]; node(around:1000,32.07649,131.17721)[product][~"^(addr:housenumber|.*name.*)$"~".",i]; way(around:1000,32.07649,131.17721)[product][~"^(addr:housenumber|.*name.*)$"~".",i]; rel(around:1000,32.07649,131.17721)[product][~"^(addr:housenumber|.*name.*)$"~".",i]; node(around:1000,32.07649,131.17721)[landuse=reservoir][name]; way(around:1000,32.07649,131.17721)[landuse=reservoir][name]; rel(around:1000,32.07649,131.17721)[landuse=reservoir][name]; node(around:1000,32.07649,131.17721)["man_made"="dyke"][name]; way(around:1000,32.07649,131.17721)["man_made"="dyke"][name]; rel(around:1000,32.07649,131.17721)["man_made"="dyke"][name]; node(around:1000,32.07649,131.17721)[water=reservoir][name]; way(around:1000,32.07649,131.17721)[water=reservoir][name]; rel(around:1000,32.07649,131.17721)[water=reservoir][name]; node(around:1000,32.07649,131.17721)[waterway=dam][~"^(addr:housenumber|.*name.*)$"~".",i]; way(around:1000,32.07649,131.17721)[waterway=dam][~"^(addr:housenumber|.*name.*)$"~".",i]; rel(around:1000,32.07649,131.17721)[waterway=dam][~"^(addr:housenumber|.*name.*)$"~".",i]; ); out center tags;
古賀根橋ダム(こがねばしダム)は、宮崎県東諸県郡綾町大字北俣字北浦、一級河川・大淀川水系本庄川第2次支流綾北川に建設されたダムである。
Koganebashi Dam (Japanese: 古賀根橋ダム) is a gravity dam located in Miyazaki Prefecture in Japan. The dam is used for irrigation and power production. The catchment area of the dam is 281 km2. The dam impounds about 12 ha of land when full and can store 1381 thousand cubic meters of water. The construction of the dam was started on 1953 and completed in 1958.
no matches found
levee (Q105190) | man_made=dyke |
dam (Q12323) | water=reservoir, drinking_water, landuse=reservoir, waterway=dam |
product (Q2424752) | product |
obstacle (Q264661) | barrier |
Dams in Miyazaki Prefecture | waterway=dam |